Alaska Energy Authority (AEA) - **Author:** R.W. Retherford Associates Progress report for study of four possible hydro sites to serve Akutan
Ongoing
1980-01-01
2018-08-09 15:12:01 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan (Site No. 4)

Alaska Energy Authority (AEA) - **Author:** R.W. Retherford Associates Progress report for study of four possible hydro sites to serve Akutan
Ongoing
1980-01-01
2018-08-09 15:12:01 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan (Loud Creek)

Alaska Energy Authority (AEA) - **Author:** OTT Engineering, Inc. and Dryden & LaRue, Inc two potential hydro sites for Akutan were evaluated. previous studies gathered to determine feasibilty of constructing a hydro facility at Akutan.
Ongoing
1989-01-01
2018-08-09 15:12:01 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan

Alaska Energy Authority (AEA) - **Author:** Polarconsult Alaska, Inc. field recon. for potential detailed design revision of existing hydro project.
Ongoing
1985-01-01
2018-08-09 15:12:02 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan (North Creek)

Alaska Energy Authority (AEA) - **Author:** OTT Engineering, Inc. and Dryden & LaRue, Inc two potential hydro sites for Akutan were evaluated. previous studies gathered to determine feasibilty of constructing a hydro facility at Akutan.
Ongoing
1989-01-01
2016-03-08 10:19:03 -0900
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Town Creek (Akutan)

Alaska Energy Authority (AEA) - **Author:** EES Consulting, Inc. and McMillan, LLC Field review and recommendations for repairs/upgrades to the Town Creek Hydroelectric Project
Completed
2010-01-01
2018-08-09 15:14:45 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan (North Creek)

Alaska Energy Authority (AEA) - **Author:** OTT Water Engineers, Inc. & T.D. Humphry, P.E. Co. preliminary design with 2 rock-filled dams on E and W forks of North Creek.
Ongoing
1980-01-01
2018-08-09 15:12:02 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan (north side project, North Creek)

Alaska Energy Authority (AEA) - **Author:** Polarconsult Alaska, Inc. field recon. for potential detailed design revision of existing hydro project.
Ongoing
1985-01-01
2018-08-09 15:12:03 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan (Town Creek)

Alaska Energy Authority (AEA) - **Author:** Electric Power Systems, Inc. improvements recommended to existing controls for the Town Creek hydro project
Completed
2010-01-01
2018-08-09 15:12:02 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Akutan (unnamed stream, site #3)

Alaska Energy Authority (AEA) - **Author:** Ebasco Services, Inc. Study of 36 isolated communities to determine if hydropower potential exists (5 MW or <).
Completed
1980-01-01