Bethel Wind Power Project Phase 1 Deliverable: Feasibility Study

Bethel This Feasibility Study summarizes the work done to date to analyze the potential for wind power production integrated into the Bethel utility system. This summary report follows on two earlier TDX reports, which covered: - Current status of the utility, its infrastructure, loads, thermal loop and operations. - Potential wind farm sites and distribution limitations - Power plant controls...
Complete
2018-08-09 15:16:50 -0800
Project
Full Record

False Pass Wind‐Diesel Power System Conceptual Design Report

The City of False Pass began collecting data to assess their wind resource in May 2005. Data was collected through September 2007 ‐ minus a 3 month period during which the wiring to the data logger awaited repair from a bear attack. A cursory look at the data by AEA in 2007 showed excessive turbulence, so the project was put on hold. Subsequent rising fuel prices spurred the City of False Pass...
Complete
2018-08-09 15:16:51 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Community of Pilot Point Wind System Conceptual Design Report

In 2008, the Alaska State Legislature created the Alaska Renewable Energy Fund (REF). The REF was developed to assist communities across the state to reduce dependency on fossil fuels and stabilize the long-term cost of energy. Today, the REF is designed to provide grants for cost-effective renewable energy which can provide heat and power in such a manner that jobs are created, local energy...
Complete
2018-08-09 15:16:51 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Conceptual Design Report Wind-Diesel Power System for Buckland, Alaska

Buckland is located in the Northwest Arctic Borough, which is in the NANA Region. On October 8th, 2008 the Northwest Arctic Borough (NWAB) submitted a grant proposal to the Alaska Energy Authority for Wind‐Diesel Projects in Buckland, Deering, and Noorvik. The proposal was awarded $10,500,000 in 2009 and all three communities have been working towards system deployment. The NWAB and NANA...
Complete
2018-08-09 15:16:50 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Lake and Peninsula Borough Chignik Lagoon Wind Resource Assessment

This report presents a feasibility-level investigation of several alternatives for the construction of a wind power facility at Chignik Lagoon, Alaska, and includes discussions of the site characteristics, wind climate, preliminary cost estimates, and an economic analysis. The report is also based on site visits conducted in September/October 2010 and October 2011, and information from vendors,...
Complete
2018-08-09 15:16:50 -0800
Project
Full Record

City of Hooper Bay Water Treatment Plant Renewable Energy Resource Analysis

The City of Hooper Bay (City) is proposing to use wind energy to reduce the costs of heating water at its water treatment plant (WTP). The purpose of this Technical Memorandum is to examine feasible renewable energy alternatives, specifically wind turbines, and determine the most beneficial project for the residents of Hooper Bay.
Complete
2018-08-09 15:16:51 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Stebbins Wind Project Concept Design Report

This report has been prepared for the Alaska Village Electric Cooperative (AVEC) to provide a conceptual design and cost analysis for the development of wind power generation in the community Stebbins, Alaska. Stebbins is a rural, coastal community of approximately 585 residents located on St. Michael Island, 125 air miles south of Nome. AVEC is currently constructing a new power plant and bulk...
Complete
2018-08-09 15:16:52 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Renewable Energy Resource Assessment for the Communities of Cold Bay, False Pass, and Nelson Lagoon

As a result of rising energy prices, the Aleutians East Borough (AEB) is motivated to lower energy costs for its community residents and facilities. Your Clean Energy, LLC (YCE) of Anchorage was retained to perform an assessment of renewable energy resources (hydro, wind, tidal, solar, waste heat recovery) for the small, isolated communities of Cold Bay, False Pass, and Nelson Lagoon, Alaska....
Complete
2018-08-09 15:16:50 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Igiugig Wind Resource Assessment Final Report

This report presents a feasibility-level investigation of the construction of a wind power facility at Igiugig, Alaska, and includes discussions of the site characteristics, wind climate, preliminary cost estimates, and an economic analysis. The report is also based on site visits conducted in September/October 2011 and information from vendors, experience with similar projects, and...
Complete
2018-08-09 15:16:51 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Point Lay Wind-Diesel Conceptual Design Report

North Slope Borough is the electric utility for the City of Point Lay. In 2009 North Slope Borough contracted WHPacific to install met towers and perform wind resource assessment analyses in five Borough communities: Point Hope, Wainwright, Atqasuk, Kaktovik, and Anaktuvuk Pass (a wind resource assessment was previously completed by U.S. DOE for Point Lay). This was followed in 2011 with a...
Complete
2018-08-09 15:16:52 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Teller, Alaska Wind Resource Report

Alaska Village Electric Cooperative (AVEC), as the utility for Teller and nearby Brevig Mission, initiated a wind resource study in Teller in 2009 to identify a suitable site for wind turbines to supply Teller with wind energy. This initial effort focused on identifying a met tower site (referred to as Site 1) near Teller as project development construction costs would be relatively low and a...
Complete
2018-08-09 15:16:52 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Alaska Environmental Power Golden Valley Electric Association Delta Junction Wind Plant Impact Study

Alaska Environmental Power (AEP) contracted with Electric Power Systems Inc. (EPS) to perform a grid impact study for the proposed new Delta Junction Wind Plant, interconnected to the Golden Valley Electric Association (GVEA) system near Delta Junction. The Delta Junction wind plant consists of 16 wind turbines rated at 1.6 MW each, step-up transformers, and a collector system connecting to the...
Complete
2018-08-09 15:16:50 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Marshall Wind Project Concept Design Report

Marshall%20wind%20cdr%20all This report has been prepared for the Alaska Village Electric Cooperative (AVEC) to provide conceptual design and cost analysis for development of wind power generation in the community of Marshall, Alaska. Marshall is a rural community of approximately 407 year– round residents located on the north bank of Polte Slough, north of Arbor Island, on the east bank of the Yukon River in the...
Complete
2018-08-09 15:16:51 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

RPSU Project Port Heiden

Port%20heiden This Conceptual Design Report (CDR) was prepared by CRW Engineering Group, LLC. (CRW) for the Alaska Energy Authority / Rural Energy Group (AEA). The purpose of this study is to provide a conceptual design and construction cost estimate for upgrading electrical power generation and distribution systems for the City of Port Heiden (City), Alaska. The City operates the local utility and will be...
Complete
2018-08-09 15:16:52 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Wainwright Wind-Diesel Conceptual Design Report

WHPacific Solutions Group and V3 Energy, LLC recommend the planned (2016 release) new 360 kW Northern Power System 360-39 wind turbine in a medium penetration mode for a Wainwright wind power project. This recommendation is based on Northern Power System’s track record and support network in Alaska, the ability to achieve turbine commonality with all four Borough wind power project communities...
Complete
2018-08-09 15:16:52 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Wind, Hydro and Heat Recovery Analysis Report

The effort of this study was to limit the overall evaluation to the most likely scenarios for potential wind and hydro power generation sites that are both economically and technically feasible. In an effort to make the most of available or future grant funding, we have proposed a two phase evaluation scope of work that addresses only current available information in Phase 1. Phase 2 of the...
Complete
2018-08-09 15:16:50 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Koliganek Wind‐Diesel Power System Conceptual Design Report

Koliganek was awarded a grant from the Alaska Energy Authority (AEA) in Renewable Energy Fund Round IV to complete a conceptual design for installation of wind turbines, with possible construction beginning in 2015. New Koliganek Village Council owns and operates the electric utility for the community of Koliganek.
Complete
2018-08-09 15:16:51 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record

Napaskiak Wind Power and Heat Recovery

Napaskiak Analysis by Marsh Creek LLC confirms that the AWS Truepower wind resource map is correct in assigning a Class 2 designation for Napaskiak. Due to a nearby stand of trees, there is a very high wind shear at the site as well. Despite the high cost of imported fuel, the known costs to install utility scale wind power equipment in rural Alaska does not make economic sense in a Class 2 wind...
Complete
2018-08-09 15:16:51 -0800
Aea logo 20150623 small 120x44x72ppi
Project
Full Record